1
/
of
6
Vesgantti
Vesgantti 109" L Shaped Cloud Sectional Couch, Comfy Corduroy Upholstered Modular Couches for Living Room, Modern 3 Seater Sectional Sofa with Ottoman Deep Seat, Beige
Vesgantti 109" L Shaped Cloud Sectional Couch, Comfy Corduroy Upholstered Modular Couches for Living Room, Modern 3 Seater Sectional Sofa with Ottoman Deep Seat, Beige
Regular price
$1,209.59 USD
Regular price
Sale price
$1,209.59 USD
Shipping calculated at checkout.
Quantity
Couldn't load pickup availability
Overview
- Brand : Vesgantti
- Assembly Required : Yes
- Weight Limit : 1000 Pounds
- Product Dimensions : 55.5'D x 109'W x 33'H
- Item Weight : 96.56 Pounds
- Type : Sectional
- Color : Beige
- Special Feature : Cloud Sectional
- Room Type : Bedroom, Living Room
- Arm Style : Pillow-Top
- Seating Capacity4.00 : StyleModern
- : Seating Capacity4.00
- : StyleModern
- ShapeL-Shape : Frame MaterialWood
- : ShapeL-Shape
- : Frame MaterialWood
About this item
- Spacious and comfortable Seating: Our 109 inch large L-shaped sofa features 28.7 inch deep seating area and 24 inch ottoman, creating large ample space for your and your family rest needs. This cloud couch is designed with a double-layered high-resilience foam seat, 3 thick cushions, and 2 armrests, providing ergonomic support for your waist and back. The extremely soft double-layered seat cushions make you feel like you're in the clouds, making the sofa an ideal choice for relaxation
- Premium Corduroy Fabric: The cloud sofa is upholstered in wrinkle-resistant & soft corduroy fabric, which feels silky soft to touch. The impressive durability and stain-fighting prowess of corduroy fabric keep your modular sofas looking fresh and lively, perfet for homes with children or pets. We have multiple colors for option to match different decoration styles for fully meeting your personalized needs. Tips: There may be slight color difference due to light or display reasons
- Convertible Modular Sectional Sofa: This modular sofa features a movable ottoman for flexible switching that you create an left facing or right facing L-shaped sofa, or comfortable sectional. The versatile cloud couch allows you to customize the layout to suit your space and lifestyle. The simple solid color design makes this sofa to easily blend into different decoration style and occasions, whether it's for living room, bedroom, office and children's play areas
- Easy Assembly and Disassembly: This 109'' L-shaped couch will be delivered in 2 boxes and easily carried. Before assembly, please check all parts. You can complete the installation in 30 minutes by following the included detailed instructions. The modular cloud couch is also easy to disassemblec and carry if you would move to a new place. Note: The cushions, backrest, and pillows are vacuum-packed. After unpacking, please fluff them thoroughly, it may take 24-48 hours for fully expand
- Stable Structure and Reliable Customer Service: The frames (armrests, backrests, seat frames) of sectional sofas are made of FSC-certified wood, making them more stable, durable, and load-bearing than other products. Secure screw-on connections keep each piece firmly in place, ensuring stability while making them suitable for a variety of body types. If you are not satisfied with the sofa you received, please feel free to contact our customer service team for satisfactory customer service
Share
